Onondaga County · Central New York
Cicero, New York home energy guide
Everything we know about how home energy decisions actually play out in Cicero: National Grid territory, the Finger Lakes climate, a active installer market, and ZIPs 13039, 13029, 13212.
Start here
The three questions people actually arrive with
- Cicero solar costs and production$2.8–$3.7/W cash here. What a 10 kW system costs, makes, and cannot remove from your bill.
- Cicero backup power guideGenerator vs battery vs solar-plus-storage, decided against how the power actually fails here.
- Getting quotes in CiceroA active market. Who quotes here and what to expect from them.
- National Grid (Niagara Mohawk) rates and rulesFixed charge, all-in rate, Customer Benefit Contribution, and interconnection quirks.
- Onondaga County weather and solarFinger Lakes seasonal production curves, snow load, and what the climate actually costs you.
- Onondaga County overviewSyracuse is the county seat. Utilities, permitting, and the property-tax exemption picture.
At a glance
Cicero in six numbers
A representative system
10 kW-DC
$28,000–$37,000 cash, producing 10,800–12,200 kWh a year.
All-in power cost
$0.19–$0.26/kWh
Plus a $21 monthly basic service charge.
Filed National Grid (Niagara Mohawk) residential rates · verified Apr 2026Range spans the seasonal swing in default supply, which National Grid resets every month.
Winter production share
10%
December through February, as a share of the annual total.
Derived NREL PVWatts v8 · verified Jan 2026
Design snow load
50–70 psf
What the racking has to be engineered and stamped for.
Filed ASCE 7 ground snow load data · verified Jan 2026
Permit authority
Town of Cicero Building Department
Permits are issued by your town, city, or village — not the county. Timelines and fees vary block to block across a single county.
The 30% federal solar tax credit is gone for direct purchases.
Section 25D — the Residential Clean Energy Credit — terminated for expenditures after December 31, 2025 under Public Law 119-21. If you did not have a system installed and operational by the end of 2025, it is not available to you. Signing a contract or paying a deposit in 2025 was not enough.
Third-party ownership (a lease or a PPA) can still access the 48E business credit through the statutory window, but that credit is claimed by the system owner, not by you. Whether any of it reaches your monthly payment is a question for the contract, not the brochure.
New York's own credit is unaffected: Form IT-255 still gives 25% of qualified solar equipment cost, capped at $5,000 lifetime, with a five-year carryforward.
If a proposal for a Cicero address still shows a 30% federal credit, ask the salesperson to point you to the IRS guidance that allows it. There is not any. Current program status →
Cicero by the numbers
The inputs this page is built on
Delivery utility
National Grid
The largest upstate footprint: Buffalo and most of Erie County, Niagara County outside the municipals, Syracuse and Central New York, the Mohawk Valley, the Capital Region, and the North Country.
All-in cost of power
$0.19–$0.26/kWh
Plus a $21 monthly basic service charge that solar cannot remove.
Filed National Grid (Niagara Mohawk) residential rates · verified Apr 2026Range spans the seasonal swing in default supply, which National Grid resets every month.
Specific yield
1,080–1,220 kWh / kW-DC / yr
Finger Lakes climate zone. Dec–Feb is about 10% of the annual total.
Modeled NREL PVWatts v8 · verified Jan 2026
Snow and design load
70–130" / yr · 50–70 psf
Moderate lake-effect exposure (Lake Ontario, with local enhancement off the Finger Lakes themselves).
Filed ASCE 7 ground snow load data · verified Jan 2026
Elevation
400 ft
Elevation drives snowfall totals and design load more than latitude does in this part of the state.
Installer market
Active
Enough competition that quotes are genuinely comparable and price spread is meaningful information.
Permitting authority
Town of Cicero Building Department
Permits are issued by your town, city, or village — not the county. Timelines and fees vary block to block across a single county. The NYS Unified Solar Permit is broadly used in this area.
Housing stock
200A typical
Mostly 1965-1990 subdivisions. 100A to 150A originals with a fair number of 200A upgrades already done.
Reported monthly bills
$130–$220
Range that readers on this route have shared with us. Yours depends on usage, rate, and whether an alternative supplier is on your bill.
ZIP codes covered
13039, 13029, 13212
Coordinates 43.17, -76.09. Landmarks: Oneida Lake's west end; the Cicero Swamp.
Nearby
Places close enough to compare, and why they differ
- Syracuse · 9 mi
- Fulton · 20 miA different climate zone, so different snow load and a different winter production picture.
- Skaneateles · 23 miVillage of Skaneateles Electric Department instead of National Grid — different rate, different program eligibility.
- Oneida · 23 miA different climate zone, so different snow load and a different winter production picture.
- Auburn · 29 miNYSEG instead of National Grid — different fixed charge and a different Customer Benefit Contribution.
- Oswego · 29 miA different climate zone, so different snow load and a different winter production picture.
How this page is built
This is a generated page: the structure is shared across locations, the numbers are not. Every figure comes from the source cited beside it, with the date we last checked it. Nothing here is a quote, an appraisal, or tax advice, and none of it is specific to your roof.
Rates and incentive programs change. We re-verify utility tariffs and NYSERDA program status on a rolling schedule and stamp the date on each number rather than on the page, so you can see which specific figures are fresh. Full methodology · Program status tracker · About the Local Energy Playbook
Page content last reviewed April 2026.