Consolidated Edison · Flat rate
Con Edison SC-1 Rate I (EL1) explained
The default for Con Edison residential customers in NYC and Westchester.
The rate
Residential Service (flat)
Basic service charge
$22 / month
$264 a year, charged at zero kWh. No amount of solar removes it.
Filed Con Edison residential electric rates · verified Apr 2026Basic service charge. Con Edison also layers a per-kWh delivery charge on top.
All-in cost of energy
$0.31–$0.40 / kWh
Delivery plus supply plus surcharges. Divide your own bill total by your kWh to find your real number.
Filed Con Edison residential electric rates · verified Apr 2026The highest residential all-in cost in the state by a wide margin, and the reason downstate solar pencils on a much shorter horizon than upstate.
Customer Benefit Contribution
$1.09 / kW-DC / month
On a 9 kW system that is $118 a year, for the life of the array.
Filed Customer Benefit Contribution (CBC) rates · verified Jan 2026
VDER / NYISO zone
I (Dunwoodie / Westchester), J (New York City)
Determines Value Stack pricing where VDER applies instead of net metering.
Solar
What this rate does to solar economics
Net metering at a $0.31-$0.40 all-in rate is the strongest solar economics in New York. Payback periods downstate routinely land years shorter than upstate on identical hardware — the difference is the rate, not the sunshine.
Show the arithmetic
A household using 10,000 kWh a year on SC-1 Rate I (EL1) pays roughly $3,550 for energy at the $0.35/kWh midpoint, plus $264 in basic service charges, plus $118 in CBC once a 9 kW array is interconnected. A 100% offset removes the $3,550 and leaves the $382.
Midpoint arithmetic for illustration. Your all-in rate depends on your supply arrangement and the season.
Storage
What this rate does to battery economics
Flat rate means no arbitrage, but Con Edison's absolute price level makes any self-consumption worth roughly twice what the same kWh is worth in Buffalo. Storage still does not pay for itself on bill savings alone.
Watch out
Catches on this rate
- Secondary network distribution areas — much of Manhattan and dense parts of Brooklyn and Queens — restrict export. Some addresses can only install non-exporting systems, or need a network protector study first.
- Con Edison's interconnection review is the slowest of the New York utilities. Budget months, not weeks.
- A dedicated, accessible, lockable AC disconnect is generally required.
Interconnection
Getting connected on Con Edison
- Secondary network distribution — common in Manhattan and dense parts of Brooklyn and Queens — is designed to push power one direction only. Exporting solar onto a network can require a network protector study, an export-limiting device, or in some cases is simply not permitted.
- Radial-fed areas, which covers most of Staten Island, the Bronx, outer Queens, and Westchester, behave much more like the rest of the state.
- Con Edison's review is the slowest in New York. Six months from application to Permission to Operate is not unusual.
- NYC also layers its own DOB filing and FDNY rooftop-access requirements on top of the utility process. Setback rules eat usable roof area.
Application to Permission to Operate
10–30 weeks
Utility-side only. Permitting and install scheduling are on top.
Observed GridReady quote and bill review sample · verified Apr 2026Wide band because network-area addresses behave completely differently from radial-fed ones.
Where this applies
Places on Con Edison
Questions
Con Edison SC-1 Rate I (EL1) FAQ
- What is Con Edison SC-1 Rate I (EL1)?
- Residential Service (flat). The default for Con Edison residential customers in NYC and Westchester. It carries a $22 monthly basic service charge and an all-in cost of $0.31–$0.40 per kWh once delivery, supply, and surcharges are combined.
- How does SC-1 Rate I (EL1) affect solar payback?
- Net metering at a $0.31-$0.40 all-in rate is the strongest solar economics in New York. Payback periods downstate routinely land years shorter than upstate on identical hardware — the difference is the rate, not the sunshine.
- Is a home battery worth it on Con Edison SC-1 Rate I (EL1)?
- Flat rate means no arbitrage, but Con Edison's absolute price level makes any self-consumption worth roughly twice what the same kWh is worth in Buffalo. Storage still does not pay for itself on bill savings alone.
- Am I on SC-1 Rate I (EL1)?
- Look at the service classification printed on your Con Edison bill — it will name the rate directly. The default for Con Edison residential customers in NYC and Westchester.
- What is the Customer Benefit Contribution on Con Edison?
- $1.09 per kW-DC per month, charged on net-metered systems interconnected on or after January 1, 2022. On a 9 kW system that is about $118 a year, every year, for the life of the array. It is charged on installed capacity rather than on export, which is why oversizing costs you twice.
Next step
Find your own number
The band above is a range for the whole territory. Your all-in rate is one division away.
- Electric bill checkWork out your own all-in $/kWh from a real bill, not from an average.
- Full bill reviewLine-by-line read of delivery, supply, and surcharges.
- ESCO mailer decoderIf a third-party supplier is on your bill, this works out whether it is costing you.
Official source: Rates · Distributed generation · Outage map
How this page is built
This is a generated page: the structure is shared across locations, the numbers are not. Every figure comes from the source cited beside it, with the date we last checked it. Nothing here is a quote, an appraisal, or tax advice, and none of it is specific to your roof.
Rates and incentive programs change. We re-verify utility tariffs and NYSERDA program status on a rolling schedule and stamp the date on each number rather than on the page, so you can see which specific figures are fresh. Full methodology · Program status tracker · About the Local Energy Playbook
Page content last reviewed April 2026.